Determination of the Instream Flow Requirements of the Senqu, Matsoku and Malibamatso and Senqunyane Rivers, as part of the Feasibility studies for all four phases of the proposed Lesotho Highlands Water Project: Co-leader of all pre-project activities including project design, production of the project proposal and negotiations with the client. Responsibilities include: co-ordination of an IFR Team of international scientists, co-ordination of all IFR activities, Habitat Integrity Assessment of the Senqu, Matsoku and Malibamatso and Senqunyane Rivers within the study area, report writing and compilation of all major reports. This project led to the development of DRIFT and several other major projects with LHDA. Joint Venture with SMEC International.
Determination of the water quantity component of the Ecological Reserve for the main rivers within the Breede River Basin as part of the wider Breede River Basin Study (BRBS).
Determination of the Instream Flow Requirements of the Palmiet River, Western Cape as part of the Feasibility studies for the proposed Palmiet Phase 1 development. Responsibilities include: co-ordination of all IFR activities, Habitat Integrity Assessment of the Palmiet River within the study area.
Development of a system for assessing the habitat integrity and ecological importance of rivers in the Western Cape to facilitate proactive steps to be taken
A project to develop a protocol for selection of reference and monitoring sites for the National Biomonitoring Programme. Project included organisation and co-ordination of a national workshop involving 21 river scientists, chairing workshop sessions, production of the proceedings of the workshop, technical design and decision making, production of a report on reference and monitoring site selection, presentations to the scientific community. The National Biomonitoring Programme has now been running successfully for almost decade.
Preparation of a river-by-river maintenance guide manual for the rivers within the Cape Town Metropole, with respect to most suitable management practice and consideration of ecological sensitivity needs.
Determination of the Instream Flow Requirements of the Wit River, Bains Kloof, as part of the Feasibility studies for the proposed Wit River Dam. Responsibilities include: project design, proposal production, co-ordination of IFR Team and all IFR activities, Habitat Specialist inputinto the design of the outlet structure in Skuifraam Dam on the Berg River, Western Cape, to facilitate the release of the channel maintenance floods requested as part of the IFR for the Berg River.
River health assessment for the Wit River, upstream of, and in, Bain’s Kloof.
Integrity Assessment of the Wit and Breede Rivers within the study area, liaison with Interested and Affected Parties. The project was terminated in March 1998, following protest against the dam.
A Bulk Water Estimate (BWE) of four river reaches being investigated as possible sites for water resource developments to supply water to the Nkomati mine. A BWE is a first estimate of the Instream Flow Requirements (IFR) that would be defined in a full-scale IFR Workshop, based on analyses of past results. Responsibilities included: determination of the preliminary Desired Future State of the study rivers through interviews with Interested and Affected Parties, organisation and co-ordination of the BWE Workshop and report writing.
A project conducted in close liaison with Interested and Affected Parties to assess the water resource developments proposed in the Western Cape System Analysis in terms of the following: the conservation status (habitat integrity), relative rehabilitation potential and relative ecological importance, within a regional context, of the rivers on which they are situated; the potential impacts of inundation on vegetation and fish; the viability of the projected yields of each scheme, from an environmental perspective and with respect to the needs of the downstream riverine ecosystems, taking into account their relative ecological importance.
Phase 1 of the Palmiet Catchment Management Plan (PCMP) had the following objectives: to identify and source existing information on the Palmiet River catchment that could be used to inform the PCMP; to summarise the nature of the existing information; to assess the reliability of the existing information and its applicability to the PCMP; to determine additional information required for the PCMP; to recommend actions required to gather the additional information; to provide a work programme and a cost estimate for the collection of the additional information.
A situation assessment of the Eerste River, Stellenbosch, including a Habitat Integrity Assessment.Project activities included field sampling, report production and liaison with the client.