Year: 2009 – 2011 | Client: ERM/ Riversdale Coal, Australia | Location: Mozambique
Assessment of the possible impacts on the lower Zambezi River, and in particular the Zambezi Delta as a result of proposed dredging operation. This work included modelling the impact of four different scenarios of operation (timing and design of waterways) on the ecosystem functioning of the Zambezi River and floodplains/delta from Tete to the sea.